Unknown: Function get_magic_quotes_runtime() is deprecated in /home/wwwroot/laowu.ihangz.com/system/library/so/extra_slider/Cache_Lite/Lite.php on line 826Unknown: Function get_magic_quotes_runtime() is deprecated in /home/wwwroot/laowu.ihangz.com/system/library/so/extra_slider/Cache_Lite/Lite.php on line 747 Liheng ZLJ tunnel drilling rig, coal mine water and gas exploration equipment, multi angle fully hydraulic grouting reinforcement drilling rig
Liheng ZLJ tunnel drilling rig, coal mine water and gas exploration equipment, multi angle fully hydraulic grouting reinforcement drilling rig

Liheng ZLJ tunnel drilling rig, coal mine water and gas exploration equipment, multi angle fully hydraulic grouting reinforcement drilling rig

0 reviews 0 sold. Only 95 remain
¥3,000.00
Ex Tax: ¥3,000.00
Product Code: fw240910516581
Availability: In Stock
Viewed 42 times

Available Options

Item specifics

  • Construction site Surface, tunnels
  • Crushing method Rotary drilling rig
  • Drilling angle range three hundred and sixty
  • Drilling depth two hundred;Medium deep hole drilling rig
  • Drilling diameter 50-300
  • Electric motor power fifteen
  • Is it a cross-border export exclusive source of goods no
  • Order number 010
  • Processing customization yes
  • purpose Grouting reinforcement, water and gas exploration
  • Rated voltage (V) 380/660
  • Vertical shaft diameter (mm) Φ54
  • Vertical shaft speed (r/min) 123/219/385
  • weight Driving, climbing, sand, obstacle crossing, twisting, crossing, music, lighting

Product Description

注浆 (1).jpg
注浆 (2).jpg
注浆 (3).jpg
注浆 (4).jpg
注浆 (5).jpg
注浆 (6).jpg
注浆 (7).jpg
注浆 (8).jpg
注浆 (9).jpg
注浆 (10).jpg
注浆 (11).jpg
注浆 (12).jpg
注浆 (13).jpg
注浆 (14).jpg
Liheng ZLJ tunnel drilling rig, coal mine water and gas exploration equipment, multi angle fully hydraulic grouting reinforcement drilling rig

Write a review

Note: HTML is not translated!
    Bad           Good

When you order from opencartworks.com, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Size Chart
Liheng ZLJ tunnel drilling rig, coal mine water and gas exploration equipment, multi angle fully hydraulic grouting reinforcement drilling rig

Liheng ZLJ tunnel drilling rig, coal mine water and gas exploration equipment, multi angle fully hydraulic grouting reinforcement drilling rig

¥3,000.00