Unknown: Function get_magic_quotes_runtime() is deprecated in /home/wwwroot/laowu.ihangz.com/system/library/so/extra_slider/Cache_Lite/Lite.php on line 826Unknown: Function get_magic_quotes_runtime() is deprecated in /home/wwwroot/laowu.ihangz.com/system/library/so/extra_slider/Cache_Lite/Lite.php on line 747 ZLJ fully hydraulic crawler tunnel drilling rig, building foundation bridge 360 ° grouting reinforcement drilling rig, dual liquid grouting
ZLJ fully hydraulic crawler tunnel drilling rig, building foundation bridge 360 ° grouting reinforcement drilling rig, dual liquid grouting

ZLJ fully hydraulic crawler tunnel drilling rig, building foundation bridge 360 ° grouting reinforcement drilling rig, dual liquid grouting

0 reviews 0 sold. Only 130 remain
¥2,000.00
Ex Tax: ¥2,000.00
Product Code: fw240910270145
Availability: In Stock
Viewed 40 times

Available Options

Item specifics

  • Construction site Surface drilling rig
  • Crushing method Rotary drilling rig
  • Drilling angle range three hundred and sixty
  • Drilling depth diver;Medium deep hole drilling rig
  • Drilling diameter 50-200
  • Electric motor power fifteen
  • Is it a cross-border export exclusive source of goods no
  • Order number 033
  • Processing customization yes
  • purpose Grouting reinforcement, water and gas exploration
  • Use drill rod (mm) Φ50/42
  • Vertical axis travel (mm) four hundred
  • Vertical shaft speed (r/min) 123/219/385
  • weight eight hundred

Product Description

履带ZLJ (1).jpg
履带ZLJ (2).jpg
履带ZLJ (3).jpg
履带ZLJ (4).jpg
履带ZLJ (5).jpg
履带ZLJ (6).jpg
履带ZLJ (7).jpg
履带ZLJ (8).jpg
履带ZLJ (9).jpg
履带ZLJ (10).jpg
履带ZLJ (11).jpg
履带ZLJ (12).jpg
ZLJ fully hydraulic crawler tunnel drilling rig, building foundation bridge 360 ° grouting reinforcement drilling rig, dual liquid grouting

Write a review

Note: HTML is not translated!
    Bad           Good

When you order from opencartworks.com, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!

Size Chart
ZLJ fully hydraulic crawler tunnel drilling rig, building foundation bridge 360 ° grouting reinforcement drilling rig, dual liquid grouting

ZLJ fully hydraulic crawler tunnel drilling rig, building foundation bridge 360 ° grouting reinforcement drilling rig, dual liquid grouting

¥2,000.00